3 STEPS TO SIMPLIFY YOUR CAPACITOR BANK SIZING CALCULATIONS

3 STEPS TO SIMPLIFY YOUR CAPACITOR BANK SIZING CALCULATIONS

 

Once the basics of reactive power compensation, capacitors and their functions and the need for detuned reactors is understood, the next step is choosing the size, number of steps and other details of the power factor correction capacitor bank.

 

Here are 3 steps that take you through the process of selecting the right power factor correction unit based on the network characteristics.

The single line diagram above can be used as a test case to explain the process.

 

1.       Identify all Key Network Parameters

 

The first step is to identify all the key network parameters required to compute the required kVAr of the Power Factor Correction Unit. Primarily, these are the Network Voltage and Frequency, and the Apparent and Actual Power of the installation.

 

a.       Network Voltage U                                                                 = 415 V

b.       Network Frequency f                                                             = 50 Hz

c.       Apparent Power of the Installation P (kVA)                   = 1500 kVA

d.       Actual Power of the installation P (kW)                           = 1182.5 kW      

 

2.       Determine the Uncompensated Power Factor and Targeted Power Factor for the Network

 

The second step is to identify the present uncompensated Power Factor of the network. Next, consider Utility requirements and type of installation to set the Target Power Factor level of the network.

 

Uncompensated Power Factor cos Φ of the network        = 0.80

Targeted Power Factor cos Φ’ of the network                      = 0.92

(may differ based on installation and utility requirement)

 

3.       Perform Calculations to determine Capacitor Bank size (kVAr)

Our Stories

Dorman Smith team conducted successfully a custom made "Lunch & Learn" workshop for Architecture & Planning Group (APG Consulting) design team.... During the workshop Mr. Ganesh the General Manager - Sales & Marketing covered important topics such as; the design verification of the LV Switchgear as per the IEC 61439 & ADDC regulations.